View Details of Code :: 4310
4310: Maintenance Procedure and Operation |
|||
Code No. |
Particulars |
Date |
Circular/Guideline No. |
4310.27 |
Use of Micro-surfacing for the renewal course, maintenance and repair on National Highways |
28.09.2016 |
RW/NH- 33044/68/2016/S&R (R) |
4310.26 |
12.04.2004 |
RW/NH-34066/11/2004-S7R(B) |
|
4310.25 |
31.01.2003 |
RW/NH-34059/2/2001-S&R(B) |
|
4310.24 |
Maintenance of wearing coat bridges and culverts vis-à-vis strengthening of approaches thereof |
1.06.2000 |
RW/NH-33044/10/2000-S&R |
4310.23 |
12.09.90 |
RW/NH/34020/1/90-DO II |
|
4310.22 |
Panel of Independent consultants for repairs/rehabilitation of bridges |
13.01.89 |
RW/NH/34020/1/90-DO II |
4310.21 |
13.01.89 |
RW/33044/2/88-DO II |
|
4310.20/608 |
27.06.85 |
RW/NHIII/P/13/85 |
|
4310.19 |
3.12.83 |
NH-VI-67(29)/76 |
|
4310.18 |
18.11.83 |
NHVI-50(3)/83 |
|
4310.17 |
16.06.83 |
RW/PL-17(14)/76-Vol. II |
|
4310.16 |
21.04.83 |
NH-VI-50(3)/83 |
|
Flood Damages to NHs-Instructions Regarding Mitigation, Reporting and Remedial Measures |
4.08.81 |
||
Maintenance of Existing Concrete Bridge Susceptible to Corrosion |
31.03.81 |
||
4310.13/4210 |
Damage of NHs due to heavy rains, Flood/water-logging-Need for proper, Permanent Remedial Measures |
8.08.79 |
NH-VI-67(3)/79 |
4310.12 |
4.08.79 |
NH-VI-67(3)/79 |
|
28.06.79 |
|||
4310.10 |
2.05.79 |
NHIII/P/2/79 |
|
4310.9 |
8.01.79 |
NHIII/P/2/79 |
|
4310.8 |
27.04.77 |
PL-30(28)/77 |
|
4310.7 |
26.03.77 |
PL.67(20)/76 |
|
Acceptance of Central Financial Liability for the Development/Maintenance of Urban Road Links of NHs |
10.08.76 |
||
4310.5/4110 |
Acceptance of Central Financial Liability for the Development/Maintenance of Urban Road Links of NHs |
17.03.76 |
NHIII/P 16/76 |
4310.4 |
13.04.73 |
NHVI-8(46)/72 |
|
4310.3 |
8.03.72 |
LR-16(150)/66 |
|
4310.2/4210 |
14.09.71 |
NHI-41(11)/71 |
|
4310.1/4110 |
10.04.69 |
NHI.40(2)/68 |