View Details of Code :: 1710

1710: Superstructure

Code No

Particulars

Date

Circular/Guideline No

1710.19

Deck width of bridges for National Highways

6.02.2023

RW/NH-33044/10/2021-S&R(P&B)(192344)

1710.18

Bridges on NH

17.09.2003

Circular not available

1710.17

Important consideration in the design, construction and maintenance of prestressed concrete bridges works on NHs and under other centrally sponsored schemes-Recommendations of High Level technical Committee thereof

 26.09.90

RW/NH/34020/1/90-DO II

1710.16

Design of prestressed concrete bridges

13.01.89

RW/33044/2/88-DO II

1710.15

Supplemental Measures for design, detailing and durability of important bridge structures

31.08.87

RW/NH VI-50(3)/83-Vol II

1710.14

Launching of precast girders

19.03.87

RW/NHVI-50(3)/83-Vol.II

1710.13

Water Cement ratio to be adopted in concrete mix for prestressed concrete works

31.12.86

RW/NHVI-50(3)/83-Vol.II

1710.12

Effective Flange Width for PSC Girders

7.12.83

NHVI-50(3)/83

1710.11

Problem and Practice of Grouting Cable Ducts in PSC Bridges

22.11.83

RW/N-3&4/MAH/2379/W

1710.1

Use of Shutter Vibrators while Concreting of PSC Girders

22.10.83

RW/EI/PB/10/W

1710.9

Requirement of Test Certificates regarding high Tensile Steel

3.10.83

RW/N6/MP/1706/W

1710.8

Design of Superstructure with RCC deck Slab on Precast Girders

18.08.83

NHVI-50(3)/83

1710.7

Taking of Levels on Top of Precast Girders before laying RCC Deck Slab

5.05.83

NHVI-50(3)/83

1710.6

Decking of old Steel Girder Bridges

1.03.79

NHI/Misc/84/78

1710.5

Special precaution during Construction of PSC Structures

18.12.78

NHIII/P/18/78

1710.4

Control on Stacking of Construction Materials on Bridge Decks

8.03.77

PL-67(3)/77

1710.3

Coordination with P&T Deptt. Regarding carrying Cables over Bridges

10.05.76

N.31/AS/366/W

1710.2

Properties of Epoxies and their Usage in Cantilever Segment Construction

1.08.75

PL-87(16)/75

1710.1

Design Procedure for Shear in PSC Girders

26.03.75

PL-87(16)/75