150: Level Crossings and Over/Under Bridges
|
Code No.
|
Particulars
|
Date
|
Circular/
Guideline No.
|
150.25 |
Construction of Subway/FOB/Footpath along with ROB for closure of Level Crossing. |
14.09.2022 |
RW/NH-36098/14/2022-S&R (B)
|
150.24
|
Construction of Subway/FOB/Footpath along with ROB for closure of Level Crossing.
|
14.09.2022
|
RW/NH-36098/14/2022-S&R (B)
|
150.23
|
Road Over Bridges (ROBs) - Compendium for ROBs on Indian Railways (Report BS-132)
|
29.04.2022
|
RW/NH-15017/46/2018-P&M
|
150.22
|
MoU signed between Ministry of Road Transport and Highways and Ministry of Railways regarding construction of ROBs/RUBs on National Highways.
|
27.07.2018
|
RW/NH/34066/47 /14-S&R(B)
|
150.21
|
Provision of safety measures at approaches to Railway level crossings
|
27.11.1995
|
RW/NH-11064/1/91-DO I
|
150.20A
|
Provision of safety measures at approaches to Railway level crossings
|
22.2.1995
|
RW/NH-11064/1/91-DO I
|
150.20
|
Privatisation of construction of ROBs on National Highways under the BOT Scheme
|
22.11.1994
|
RW/NH-11033/2/87-DO I
|
150.19/604.16
|
Provision of safety measures at approaches to Railway level crossings
|
1.11.1994
|
RW/NH-11064/1/91-DO I
|
150.18A/604.14
|
Provision of safety measures at approaches to Railway level crossings
|
6.6.1994
|
RW/NH-11064/1/91-DO I
|
150.18
|
Guidelines for utilization of space beneath the ROBs/Flyovers on National Highways.
|
13.12.1993
|
RW/NH-11052/4/91-DO I
|
150.17
|
Provision of safety measures at approaches to Railway level crossings
|
26.10.1993
|
RW/NH-11064/1/91-DO I
|
150.16/604.9
|
Provision of safety measures at approaches to Railway level crossings
|
9.1.1987
|
RW/NHIII/P/31/84
|
150.15/604
|
Provision of safety measures at Railway level crossings falling on National Highways
|
20.11.1984
|
RW/NHIII/P/31/84
|
150.14/4110
|
|
27.4.1984
|
RW/NHIII/P/11/82
|
150.13
|
Overhead charges for railway over/under bridges for “Deposit works”
|
4.7.1979
|
PL-20(17)/78
|
150.12
|
Construction of road over/under bridges on NHs in replacement of level crossings – sharing of cost of works
|
22.1.1979
|
NHIII/P/4/76
|
150.11
|
Construction of level crossings for new railway sidings for industries etc.
|
22.12.1978
|
NHIII/P/45/78
|
150.10
|
Apportionment from railway safety works fund for the overbridges constructed on railway crossings within the municipal limits
|
5.7.1978
|
NHIII/Misc/57/78
|
150.9/302
|
Gradients for approaches to railway over bridges on NHs
|
21.2.1978
|
PL-30(20)/77
|
150.8/604
|
Accidents at unmanned level crossings
|
6.1.1978
|
TGS(21)/75
|
150.7
|
Provision of road over bridge for NH No. 2
|
16.4.1977
|
NHI-28(3)/69
|
150.6
|
Submission of detailed estimates – Relaxation in present practice
|
5.8.1976
|
NHIII/P/41/76
|
150.5/121.3
|
Construction of road over/under bridge connected with National Highways-Levy of departmental charges.
|
4.2.1976
|
NHIII/P/4/76
|
150.4
|
Provision of road over/under bridge in replacement of existing level crossings- apportionment of cost.
|
20.3.1971
|
SR-45(38)/67
|
150.3
|
Extracts from the Rules for the opening of the Railway-Tentative Criteria for decision of replacement on Level Crossings
|
29.10.1969
|
PL-67(8)/69-SP
|
150.2
|
Extracts from the Rules for the opening of the Railway- Level Crossings
|
2.5.1958
|
I.R.S. (M)
|
150.1
|
Extracts from the Indian Railways General Code, Vol. I
|
--
|
--
|