View Details of Code :: 604
604: Highway Safety- Railings, Barriers, Speed Breakers |
|||
Code No. |
Particulars |
Date |
Circular/ Guideline No. |
604.49 |
16.03.2023 |
RW/NH-36098/25/2022-S&R (P&B)/pt. |
|
604.48 |
22.09.2022 |
H-11013/01/2020-S&R(P&B)
|
|
604.47 |
Guidelines/SOP for monitoring and compliance of all safety norms on the Highways |
9.11.2020 |
RW/NH-29013/01/2020-S&R(P&B) |
604.46 |
9.11.2020 |
RW/NH-29011/01/2020-S&R(P&B) |
|
604.45 |
(A) Guidelines for providing type of Median on National Highways Network; and (B) Guidelines for Metal crash barrier (Semi Rigid) to be installed on National Highways. |
1.1.2020 |
RW/NH-29023/02/2019-S&R(P&B) |
604.44 |
20.9.2019 |
RW/NH-29011/01/2015-P&M(RSCE) |
|
604.43 |
23.07.2019 |
RW/NH-34066/2/2018-S&R(B)(P&B) |
|
604.42 |
25.06.2019 |
RW/NH-34066/2/2018-S&R(B)(P&B) |
|
604.41 |
30.07.2018 |
RW/ NH-34066/2/2018-S&R(B)(P&B) |
|
604.40 |
Road Safety Audit at the stage of Engineering Designs of New Roads. |
4.7.2018 |
RW/NH-29011/11/2015-P&M (SCE) |
604.39 |
12.04.2018 |
RW/NH-34066/2/18-S&R(B)(P&B) |
|
604.38 |
Road Safety – Engineering interventions & Black spot rectification |
08.07.2017 |
PPT |
604.37 |
Essential approach and principles to be followed for Road Safety Engineering works. |
20.04.2017 |
RW/NH/29011/11/2015-P&M (RSCE) |
604.36 |
Operational Road Safety Engineering audits for identifying short term safety improvement measures. |
17.02.2017 |
RW/NH-29020/1/2015-P&M (RSCE) |
604.35 |
7.9.2016 |
RW/NH-29020/1/2015-P&M (RSCE) |
|
604.34 |
29.8.2016 |
RW/NH- 33037/01l2016/S&R(R) |
|
604.33 |
16.06.2016 |
Report |
|
604.32 |
11.4.2016 |
RWINH- 33037/0I/20I6/S&R (R) |
|
604.31 |
14.1.2016 |
RW/NH-29012/1/2015/P&M(RSCE) |
|
604.30 |
Office Memorandum |
9.11.2015 |
RW/NH-15017/120/2015/P&M |
604.29 |
19.10.2015 |
RWINH-35072/04/2004-S&R (R)(Pt.) |
|
604.28 |
12.12.2012 |
RW/NH-33044/53/2012-S&R(R) |
|
604.27 |
10.5.2012 |
RT-25016/3/2012-RS |
|
604.26 |
27.4.2010 |
RWINH-35072/04/2004-S&R(R) |
|
604.25 |
Traffic safety measures on approaches to narrow Road Over Bridges (ROBs) |
31.10.2008 |
RW/NH-33044/23/2007 S&R (R) |
604.24 |
11.12.2002 |
RW/NH-33037/9/2001 S&R (R) |
|
604.23 |
Installation of Traffic Safety Barriers - Wire Rope Safety Fencing System |
13.9.2000 |
RW/NH-33044/11/97–S&R |
604.22 |
24.8.2000 |
RW/NH-11064/1/2000 US(D.I) |
|
604.21 |
Installation of Traffic Safety Barriers - Wire Rope Safety Fencing System |
4.9.2000 |
RW/NH-33044/11/97–S&R |
604.20 |
13.5.1998 |
RW/NH-11064/1/91-DO I |
|
604.19 |
Need for taking up specific Road Safety works in 9th Five Year plan |
4.2.1997 |
RW/NH-33022/4/96-DO.III |
604.18 |
Safety precautions on 2-lane National Highways with paved shoulders |
20.12.1996 |
RW/NH-33044/11/96-S&R |
604.17 |
28.6.1996 |
RW/NH-11064/1/91-DO I |
|
604.16 |
Provision of Safety Measures at Approaches to Railway Level Crossings |
1.11.1994 |
RW/NH-11064/1/91-DO I |
604.15 |
Installation of safety barriers along the Indian road network |
24.6.1994 |
RW/NH/33022/1/94-DO III |
604.14 |
10.2.1993 |
RW/NH-11064/1/91-DO I |
|
604.13/150.17 |
Provision of safety measures at approaches to railway level crossings (See code 150.17) |
26.10.1993 |
RW/NH-11064/1/91-DO I |
604.12 |
03.11.1989 |
RW/NH-33022/3/89-DO II (C) |
|
604.11 |
Safety precautions to be taken on roads running parallel to rivers or canals |
03.11.1989 |
RW/NH-33022/3/89/DO II (6) |
604.10 |
23.09.1987 |
RW/11064/1/87-NHIII/DI |
|
604.9/150.16 |
Submission of detailed estimates – Relaxation in present practice |
09.01.1987 |
NHIII/P/31/84 |
604.8/150 |
20.11.1980 |
RW/NHIII/P/31/80 |
|
604.7 |
18.11.1980 |
RW/NHIII/P/29/78 |
|
604.6 |
28.2.1980 |
NHIII/P/29/78 |
|
604.5 |
25.4.1978 |
PL-50(8)/72-NHVI |
|
604.4/150 |
6.1.1978 |
TGS(21)/75 |
|
604.3 |
4.6.1976 |
PL-50(8)/72 |
|
604.2 |
4.3.1976 |
PL-67(14)/75 |
|
604.1/500 |
19.10.1973 |
NHIII/MISC/51/73 |